05.15.09

IYA 2009 – So much for one a day…

Posted in IYA2009 at 15:07 by Kathleen

Well, I doubted from the start whether I would be able to post one blog a day for year. It lasted for one and half month. That is one month more than I expected. Yet, I am a bit disappointed.
Read the rest of this entry »

02.11.09

IYA 2009 – Staff Survey

Posted in IYA2009 at 21:46 by Kathleen

Many meetings again today. One of them was a discussion group about the staff survey that was conducted few months ago.
Read the rest of this entry »

02.10.09

IYA 2009 – Separated by 10 000 km, yet functional

Posted in IYA2009 at 21:30 by Kathleen

Other than project planning (yep! not done yet), I met with two of my team members today. Well, I did not physically meet them. One meeting was by videoconference, the other was on the phone. They are both based in Chile.
Read the rest of this entry »

02.09.09

IYA 2009 – NICI

Posted in IYA2009 at 22:31 by Kathleen

The end of the planning madness is still far but I am starting to see the light. The F2 plan is completed and I used it as a template for the NICI data reduction software plan. A couple more plans are done too. I still have several more to go, including two big ones, but still, I am pretty happy with the progress made.
Read the rest of this entry »

02.08.09

IYA 2009 – This blog

Posted in IYA2009 at 21:29 by Kathleen

Wow! This blog is quite a commitment. No, I am not about to quit, though part of me wished I could. But I happened to be stubborn.
Read the rest of this entry »

02.07.09

IYA 2009 – So glad I am not being called

Posted in IYA2009 at 21:07 by Kathleen

Today I had a dinner party at a friend’s and colleague’s place. Before dinner, he received a call: it was the summit calling.
Read the rest of this entry »

02.06.09

IYA 2009 – F2 project plan

Posted in IYA2009 at 20:55 by Kathleen

Almost a whole day spent on a single project plan. And I am not completely done! I hope it pays off in the long run.
Read the rest of this entry »

02.05.09

IYA 2009 – Could you let me get on with my work, please?

Posted in IYA2009 at 21:40 by Kathleen

Four and half hours of meetings. I would say that only one of those hours was useful, or at least useful to me. And we wonder why things do not get done.
Read the rest of this entry »

02.04.09

IYA 2009 – Water cooler discussion day

Posted in IYA2009 at 21:24 by Kathleen

The day started with a seminar from a candidate for the Deputy Director position, followed by a science staff meeting with controversial topics. That was good fuel for a full day of water cooler discussions.
Read the rest of this entry »

02.03.09

IYA 2009 – PDR is the theme of the day

Posted in IYA2009 at 20:57 by Kathleen

Today I focused on catching up with the material we will present at the data reduction pipeline project PDR (Preliminary Design Review) later this month.
Read the rest of this entry »

« Previous entries Next Page » Next Page »